Home
About Us
Request a Document
Testimonials
FAQs
Contact Us
Login
in here
Site Map
If you would like to access a specific part of our website then please click on the relevant link below:
Home
About Us
Request a Document
Projects
The Villa
Health and Safety
Manuals
Certificates and Approvals
St. Vincents New Art Room
1221 Health and Safety
1221 Certificates and Approvals
Final H&S File
Suretank Headquarters
Contents Pages
Contract Title
2.1- Description of Works
2.2 - List of Subcontractors & Suppliers
2.3 - Modification Details
2.4.1 - Roof Covering
2.4.2 - Composite Design
2.4.3 - Brise Soleil Systems
2.4.4 - Precast Stairs
2.4.5 - Insulation
2.4.6 - Brick - Block Construction
2.4.7 - Wall Ties, Insulation Restraints, Etc
2.4.8 - Rain Water Componenets
2.4.9 - Fire Protection
2.4.10 - Plastering
2.4.11 - Suspended Ceilings
2.4.12 - Windows & Doors
2.4.13 - Ironmongrey
2.4.14 - Flooring
2.4.15 - Sundry Construction Materials
2.4.16 - Painting
2.4.17 - Paving Flags
2.4.18 - Retaining Wall
2.4.19 - Civil Work
2.4.20 - Interceptor
2.4.21 - Pro-Stainless
2.4.22 - Trocal Roof
2.5 - Guarantees Testing and Commissioning - 2.5.26 - Cube test results
2.5 - Guarantees Testing and Commissioning - 2.5.27 - Lift Installation
2.6 - ARCHITECT - As Installed Drawings
2.7 - STRUCTURAL & CIVIL- As Built Drawings
3.0 - EVAN HENRY ELECTRICAL O+M MANUAL
3.1 Accessories and Dado Trunking
3.2 As Built Drawings
3.3 Communications Installation
3.4 External Lighting
3.5 Fire Alarm
3.6 Hand Dryer
3.7 Lighting
3.8 Lightning Protection
3.9 Narrative
3.10 Refuge + Call Systems
3.11 Security Systems
4.0 NEACY MECHANICAL O+M MANUAL
Testimonials
FAQs
Forgot your password
Contact Us
Login
Site Map